2022-2023 Undergraduate and Graduate Bulletin (with addenda) 
    
    Apr 26, 2024  
2022-2023 Undergraduate and Graduate Bulletin (with addenda)

CE-UY 3513 Construction Scheduling

3 Credits
Students learn to apply the Critical Path Method (CPM) to construction projects, using precedence diagram networks. The course covers sequencing, cost allocation, updating, cash flow, resource constraints and scheduling, manpower leveling and distribution, time-scale networks, lead and lag-time constraints, time-cost tradeoffs, overlap and other specific leading edge scheduling techniques. Students direct an entire project from planning through scheduling and control, both manually and through software.

Prerequisite(s): Any two CE-UY 25xx courses
Weekly Lecture Hours: 2.5 | Weekly Lab Hours: 1.5 | Weekly Recitation Hours: 0